2K SOLVENTBORNE EPOXY ZINC-RICH ANTI-CORROSION PRIMER
PRODUCT DESCRIPTION
This is a two-component polyamide cured zinc-rich epoxy coating. It is a very high zinc dust-containing product. It provides excellent corrosion protection as part of a complete coating system. Suitable for carbon steel, repair of inorganic zinc silicate coating, and damaged galvanized steel substrates.
FEATURES & APPLICATION
- Excellent cathodic protection, anti-corrosion, and wearing resistance; 
- Easy to reach high thickness and good application properties; 
- Good weather resistance, rapid drying; 
- Less burn during gas-cutting and welding; 
- Strong adhesion to the surface, good compatibility with various topcoats. 
As a primer on sandblasted steel, epoxy zinc-rich primers can be used in combination with high-performance paints to further improve corrosion resistance. Mainly used as primer for steel surface of bridges, ships, petrochemical infrastructure, containers, steel structures, etc.
PRODUCT PICTURES
| 
 | |
| Front | Back | 
APPLICATION AREAS
| 
 | 
 | 
 | 
 | 
| Substations | Substations | Transmission line | Transmission line | 
RECOMMENDATION
Recommended viscosity:
- Airless spray: 45″—55″ 
- Air spray: 20±2″ 
- Brush: 35″—45″ 
Surface preparation:
- The substrate temperature must be 3°C above the dew point; 
- Rinse away salt and other water-soluble contaminants with clean water; 
- Remove grease according to SSPC-SP1 solvent cleaning standards; 
- Sandblasting to remove rust, oxide, and damaged shop primer to ISO Sa2.5 (SSPC-SP10); After sandblasting and rust removal, the primer must be sprayed within 4 hours; 
- Suitable for pre-treated bare steel; 
- Blow away dust and other dirt with high-pressure air; 
- Make sure the surface is clean and dry before application. 
Safety Precautions:
- The following measures shall be guaranteed during any paint applications: 
- Avoid skin and eye contact; 
- In case of skin or eye contact, flush with a large amount of water and immediately get medical attention; 
- Assure good ventilation; 
- Observe all health and safety regulations on-site. 
COMBINED SOLUTIONS FOR REFERENCE
1.Cost-effective solution for moderately polluted environment
Epoxy zinc rich primer + Polyurethane topcoat
2.Cost-effective solution for heavily polluted environment
Epoxy zinc rich primer + Epoxy MIO micaceous iron oxide intermediate coat + Polyurethane topcoat
3.Platinum solution for normal and low-pollution environment
Epoxy zinc rich primer + Fluorocarbon topcoat
4.Cost-effective solution for moderately polluted and heavily polluted environments
Epoxy zinc rich primer + Epoxy MIO micaceous iron oxide intermediate coat + Fluorocarbon topcoat
TECHNICAL DATA SHEET
| No. | Items | Technical Data | ||||
| 1 | Zn % in dry film | 60 | ||||
| 2 | Specifiic gravity | 2.5 | ||||
| 3 | Dry film thickness um | 75 | ||||
| 4 | Solid by weight % | 88±2 | ||||
| 5 | Theoretical spreading rate m2/kg (75μm) | 3.26 | ||||
| 6 | VOC  g/L | 370 | ||||
| 7 | Mixing ratio | 2K, A/B = 10/1 by weight | ||||
| 8 | Package | A:30 Kg; B:3 Kg, metal bucket both | ||||
| 9 | Induction time min | 15 min | ||||
| 10 | Curing time hrs | / | 0℃ | 10℃ | 20℃ | 30℃ | 
| Surface dry | 30min | 20min | 10min | 5min | ||
| Walk-on-dry | 24hrs | 18hrs | 10hrs | 8hrs | ||
| Dried for service | 7d | 5d | 3d | 2d | ||
| Pot life | 24hrs | 10hrs | 8hrs | 7hrs | ||
| Baking (60℃) | 2hrs | |||||
| 11 | Dry to over-coat | / | 0℃ | 10℃ | 20℃ | 30℃ | 
| Min. | 20hrs | 20hrs | 18hrs | 10hrs | ||
| Max. | - | - | - | - | ||
| 12 | Shelf life | 24 months | ||||
| 13 | Thinner | 5%,specific thinner | ||||

 
  